Kangaroo

After being unable to work in the Alpine area because of the weather
it was great too have a such a nice day this time. Flowers we're good particularly
The richer Richie and the Arai TS had a lot of perfume, the
birds were singing tours and it was quite a Carmen sunny day.
the first task was to sort up some dogs at the dam wall
so that they didn't turn block the water flow under the bridge and
this was stacked so that it could be used as firewood in the park.am i n work

was at the far end of kangaroo more where the other growing vegetation was cut back
mostly by Shirley Sue and Adrian to great job without relief with the hedge trimmer.
Greg and Peter went down the track about 800 weird Greg use the chainsaw on a
fallen tree that we knew about.
After lunch we resumed work on the clearing are the kangaroo more
section and by the time we called it quits 300 m have been cut which was pretty great effort.

Greg cut through another tree on the way back to the car park so in all it was a very productive day

Comments

Popular Posts